The Ground Beneath the Loading Dock: Picking Pavement That Survives Your Heaviest Trucks
Facility designers often treat the surface under their heaviest corridors as an afterthought, then pay for it in repairs within five years. This guide compares ballast, slab track, and reinforced pavement on a cost-per-axle basis, with a practical decision matrix for site engineers.